From Development to Production
Moving an agent system to production requires careful planning around observability, evaluation, and scalability. The transition from local development to production involves:- Trace Management: Systematically capturing and uploading agent execution traces
- Online Evaluation: Continuous monitoring of agent performance in production
- Scale Considerations: Handling increased volume and operational requirements
Production Readiness Checklist
1
Establish Observability
Configure LangSmith or equivalent tracing to capture all agent interactions. Ensure traces include:
- Input/output data
- Execution timing
- Error states
- Custom metadata (user IDs, session IDs, etc.)
2
Set Up Evaluation Pipeline
Deploy online evaluators that run automatically on production traces:
- Response quality metrics
- Latency thresholds
- Error rate monitoring
- Custom business logic validators
3
Implement Trace Upload
Build a robust system for uploading traces at scale. See Trace Upload for implementation details.
4
Configure Monitoring & Alerts
Set up dashboards and alerts for:
- Agent success/failure rates
- Evaluation score distributions
- System latency and throughput
- Cost per interaction
Key Production Patterns
Synthetic Data for Testing
Before deploying to production, generate synthetic traces that mirror expected production patterns:Time-Shifted Trace Upload
When uploading historical or synthetic traces, shift timestamps to appear recent:ID Regeneration
When re-uploading traces, generate fresh IDs while preserving parent-child relationships:Operational Excellence
Batching and Flushing
Always batch trace uploads and explicitly flush when complete:Error Handling
Production agents must gracefully handle failures:Production Deployment Strategies
Blue-Green Deployment
- Deploy new agent version alongside existing version
- Route small percentage of traffic to new version
- Monitor evaluation metrics for regressions
- Gradually increase traffic or rollback if issues detected
Canary Releases
- Deploy to single region or customer segment
- Run online evaluations continuously
- Compare metrics against baseline
- Full rollout only after validation period
Shadow Mode
- Run new agent version in parallel without serving responses
- Compare outputs against production agent
- Evaluate differences and edge cases
- Promote once confidence is established
Next Steps
Trace Upload
Implement scalable trace upload systems
Online Evaluation
Deploy continuous evaluation pipelines